| PROJECT TYPE | INDUSTRIAL |
| AREA | 24 ACRES |
| STATUS | COMING SOON |
This agricultural landscape was completely revamped. The vineyard was previously split between a hill and a plain with about 100 ft. in height difference; this was levelled out in order to optimize the quality of the vineyard. Additionally, the mountain itself was altered as well in order to create a more desirable 33-degree slope. The machinery was limited to just an Excavating Machine, D6 Dozer, D8 Dozer, and a Dirt & Rock Transporter. The construction crew was small too, with only 4 men working 7-day weeks, all in order to complete this project in just two months time.